1998
On the basis of the order of Kazakhstan Temir Zholy Republican State Enterprise (hereinafter – RSE) “On Optimization of the Management System of Signaling and Communication Department”, Transtelecom subsidiary state enterprise (hereinafter – SSE) was formed.
1999
- August. The Resolution of the Government of the Republic of Kazakhstan “On Measures to Reorganize RSE Kazakhstan Temir Zholy and the Separation from its Structure of Transtelecom Open Joint-stock Company (hereinafter – OJSC) with 100% State Participation” was issued.
- November. Date of initial state registration of Transtelecom OJSC.
2003
- Introduction of an automated billing system and technical accounting system.
- A satellite communication network was created.
- The installation and implementation of data network nodes began, and a wide range of new services, including access to the Internet, were made available to customers.
- September. Introduction of a digital automatic telephone exchange (hereinafter – ATE) at the Almaty station.
- A centralized agreement for connection to the network of Kazakhtelecom Joint-stock Company (hereinafter – JSC), as a telecommunications operator, was signed.
2004
- Transtelecom OJSC was renamed into Transtelecom JSC.
- More than 30 new digital automatic telephone exchanges have been installed.
2005
- March. FOCL construction on the Almaty-Astana section with the length of 1,340 kilometers was completed.
- April. Opening of the Communications Network Control Center and commissioning of a unified system for monitoring and administering FOCLs.
- November. The Company received a certificate of compliance with International Quality Management Standards ISO 9001-2000.
2006
- March. Participation of the Company in the international telecommunications exhibition CEBIT in Hannover, Germany.
- March. The company was awarded the Gold Medal of the International Foundation for Excellence in Business Practice.
- November. In the city of Almaty, 2 operating telegraph stations APSK 120/120 and AT-PS-PD 72/64 were replaced with the first digital Telegraph Switching Server “Vector-2000”.
2007
- September. The “POTOK” Automated Settlement System was introduced.
2008
- January. Start of modernization of telegraph stations in Astana (2 pcs.), Kokshetau, Karaganda, Kostanay, Ekibastuz with replacement of 6 operating AT-PS-PD telegraph stations by one digital Telegraph Switching Server “Vector-2000”.
- February. The Primary Backbone Network Center was established to coordinate the activities of the primary backbone network and FOCL sites.
- March. For the first time in the history of the Company, a 45 Mbit Astana-London channel was organized and put into operation for the Orange company.
- April. KTZ operational communication system SDH network was built on the Almaty-Astana section (setting of equipment, software and testing).
- July. Territorial sections of the backbone network were created in the cities of Almaty, Shu, Kokshetau, Karaganda, and Astana.
- August. A virtual POP node was organized in Moscow on M9, capacity STM1 for rational use of the Company’s resources, as well as for operational work on providing services to customers outside Kazakhstan.
- October. Testing of the STM1 level channel Astana-Petropavlovsk-Atyrau was completed, which would make it possible to unite telephone lines of Atyrau branch with branches in Almaty, Karaganda, Astana, Kokshetau and provide channel lease services for customers in Atyrau.
- October. Two VC3 Hong Kong-Almaty-Moscow were tested for British Telecom. British Telecom projects were implemented in other cities of Kazakhstan on the Company’s transport network.
2009
- December. A contract was signed with Alcatel-Lucent for the supply and installation of a large backbone transport network. The project was financed by the European Bank for Reconstruction and Development.
- 128 satellite communication systems commissioned a year earlier, passed the electromagnetic compatibility in Republican Center for Space Communications and Electromagnetic Compatibility of Radioelectronic Equipment JSC and were registered with the Agency for Informatization and Communication of the Republic of Kazakhstan with the subsequent receipt of permission for the radio-frequency spectrum.
2010
- June. Data transmission services for Tulpar-1 and Tulpar-2 branded trains Astana – Almaty – Astana were put into commercial operation (order of the Company No. 174-P dated June 01, 2010).
- June. Connection of the network of the operator KazTransNet LLP and Space.KZ LLP to the Company’s network to organize transit telephone traffic in Almaty to the Public Switched Telecommunications Network (hereinafter – PSTN) and pass-through traffic to international directions and cellular operators’ networks.
- July. HUB (central control station) OP-39 was put into operation by the decision of the State Commission.
- August. The satellite ground data and voice transmission network “High-Speed Passenger Traffic” was switched to the Company’s control station in the city of Astana (OP-39).
- September. A satellite data and voice terminal was installed on the medical train No. 3 to organize videoconferencing, based on the decision of NC Kazakhstan Temir Zholy JSC (hereinafter – NC KTZ JSC).
2011
- The Department of Design and Development carried out work to connect the Company in Novoishimsky settlement to PSTN.
- September. Fibers from the backbone cable with the length of 3.9 thousand km were branched to organize communication channels and to connect KTZ’s units to the backbone line. At that time, the total length of FOCL was 6.6 thousand km.
2012
- The first stage of FOCL construction on the Aktobe-Kandyagash section with the length of 96 km was implemented.
- The monitoring control system (cable network), located along the FOCL route, was launched.
2013
- Organization of the channel for the project “Toll Road Astana-Shchuchinsk” and setting of switch and router equipment for toll roads for EnergoRemService company, “Service for Monitoring” (Vlan) – together with Kazsatnet and Astel companies, “Service for Charging” – together with Kazteleport company.
2014
- The installation of new SkyEdge-1 satellite earth stations at 20 railway stations was organized.
- At the end of the year, within the framework of the strategic project of the automated control system “Traction Power Supply Dispatch” (TPSD ACS), 856 sections of diesel locomotives and 983 sections of electric locomotives were equipped with TPSD ACS and put into commercial operation.
- The length of the FOCL is 8,139 km.
- On a permanent basis, work was organized to provide telephony, Internet and videoconferencing services for medical trains “Salamatty Kazakhstan”, “Zhardem” and “Densaulyk”.
2015
- The beginning of the privatization of the Company.
- September. Deployment of the Kaizen/Lean Manufacturing Improvement and Management Process.
- December. In accordance with Decree No. 1141 of the Government of the Republic of Kazakhstan “On Certain Privatization Issues for 2016-2020”, the Company was included in the list of assets to be transferred to the competitive environment on a priority basis 26% minus 1 share.
- December. In Paris, the Company deployed 100G DWDM optical transport equipment from Ekinops on an optical network covering the entire country and at the border with China, which is part of a major network between China and Western Europe.
- December. The Company entered the Kazakhstan Association of Automation and Robotics.
- As part of the TPSD ACS project, locomotives were equipped with the TPSD ACS hardware and software system; since the start of the project, a total of 1,240 sections of diesel locomotives and 1,043 sections of electric locomotives had been equipped.
- The length of the FOCL is 10,954.2 km.
- Completion of research and development work on the Automated Management System “Magistral”. The beginning of “Magistral” replication in the RK.
2016
- February. The Company is a single integrator for the implementation of IT solutions, automation and telecommunications solutions for NC KTZ JSC group under the Transformation Road Map.
- February. Accreditation and commissioning of the Company’s Certification Center.
- May. Participation in the largest annual event dedicated to the development of the telecommunications transport networks market in Russia and the CIS – the 7th International Conference “Transport Networks Russia 2016”.
- May. Official sponsor of the Women’s World Boxing Championships in Astana, where 12 licenses for the Summer Olympics in Rio de Janeiro were awarded.
- June. The sale and purchase agreement for the 49% stake in the Company came into force.
- July. According to the National Business Rating Union, the Company was awarded the Industry Leader status.
- August. The “Digital Mine” information system was launched at a uranium mining enterprise in the South Kazakhstan region.
- August. The 1st Summer Sports and Athletic Contest in the Company’s history opened its doors to 16 sports teams at the Khadzhimukhan Munaitpasov Stadium.
- November. During the bilateral meeting, China Telecom Global Limited and the Company signed a memorandum of cooperation to implement the project “Provision of Broadband Access (hereinafter – BBA) to Rural Communities with a Population over 250 People”.
- November. The Company was the general partner of the largest international exhibition and conference “ASTEX-2016”.
- The length of the FOCL is 15,000 km.
2017
- The results of the open two-stage tender for the sale of 26% minus 1 share were summed up, and the winner was determined.
- The Company’s Development Strategy up to 2026 was approved.
- Launch of cybersecurity services “SOC” – Security Operation Center.
- The new organizational structure of the Company came into effect.
- Partner of the international exhibition “ASTANA EXPO-2017”.
2018
- The Company’s Contact Center was opened with a single dial-up number of 191.
- The Company rebranded itself. Part of the rebranding was the change of the trademark from “Transtelecom” to “TTC”.
- Transtelecom JSC was an advertising partner of the boxing match Golovkin – Martirosyan.
- In search of talented young people, the Company holds an Olympiad among graduates of the undergraduate program.
- The Company reached a partnership agreement with Waves Platform to integrate the Company’s Vostok blockchain platform.
- Commissioning of two new modular Data Processing Center (hereinafter – DPC) in the city of Astana near the business center “Emerald Quarter”.
- Transtelecom JSC, as the first cloud provider, connected the private cloud to the Unified Transport Network of government agencies.
- The successful long-term migration of KTZ SAP virtual infrastructure from Transtelecom’s old cloud to the new one, which began in July, was completed.
- The Company contracted for Kazakhstan’s largest joint PPP project to provide broadband Internet access to Kazakhstani villages.
2019
- The launch of free Wi-Fi in the Almaty metro as part of the implementation of the “Smart Almaty” concept.
- Transtelecom JSC was chosen as the fiscal data operator in Kazakhstan, the launch of the OFD service.
- Launch of a new transit corridor from China to Russia and Europe – 500 Gbps capacity.
- Creating a unified platform for cybersecurity services in Kazakhstan together with BI.ZONE, a subsidiary of Sberbank.
- Winning in the category “LEVEL UP” of the international business prize “WOW!HR”, with the project “Involvement in Improvement. Gamification according to Transtelecom”.
- Winning in the category “Kazakhstan” with the project “TTC Digital HR” in the annual award “HR-brand Central Asia 2019”.
- Implemented a plan to provide rural communities with Internet – the project covered 9 regions of Kazakhstan.
2020
- The project “Provision of Broadband Access to Rural Settlements of Kazakhstan using FOCL Technology” as part of the state program “Digital Kazakhstan 2020” to connect 429 settlements to broadband Internet access was completed.
- TTC is one of the major companies, which has implemented the project on construction of data center buildings with infrastructure of information resources for customers in the cities of Karaganda, Kyzylorda, Aktau, Atyrau, Aktobe, Uralsk and Zhezkazgan.
- The functional strategies of Transtelecom JSC blocks were approved.
- In 2020, a new organizational structure was implemented to improve TTC’s business efficiency and successfully overcome new market challenges. The proposed structure is based on the methodology of change management of the Adizes Institute and is built so that it can quickly respond to changes in the external environment, innovation and aims at the accumulation of unique competencies.